Bosh sahifa> Blog> Preparation before installation of passenger hoist

Preparation before installation of passenger hoist

August 31, 2022
1. Ensure selected installation site satisfy all requirements of local quality control dept, and obtain permission of them before installation of the passenger hoist.
2. Ensure the selected installation site has road and yard to transport and stack the construction hoist and its parts.
3. To protect stabilization of the hoist you should make the machine near the building, but the distance between moving parts of hoist and fixed constructing equipment should be not less than 250mm.
4. Make sure that there is power supply on the erection site. Provide a power box specialized for the hoist and a switch for each Passenger Hoist Cage.
5. The main power of site should connect with transformer substation by 3×25+2×10mm2 cable. Each cage has one cable. Increase section of cable with the distance increased.
6. Make sure that there is lifting equipment and tools at the erection site.
7. Cast a foundation according to manufacture's needs.
8. Prepare pre-embedded parts and fixed parts of tie-in.
9. Check parts according to packing list during transporting and storage. If missing or damage, should repair or replace in time.
10. According to equivalent ordinance and requirement to set up grounding protection device, its grounding resistor is less than 4Ω.

20210304

Biz bilan bog'lanish

Author:

Mr. Rick Zhao

E-mail:

bq@bq-sy.com

Phone/WhatsApp:

+86 13940298638

Ommabop mahsulotlar
Blog News
You may also like
Related Categories

Ushbu etkazib beruvchiga elektron pochta

Mavzu:
E-pochta:
Xabar:

Xabaringiz 20-8000 belgigacha bo'lishi kerak

Biz darhol siz bilan bog'lanamiz

Siz bilan tezroq bog'lanishingiz uchun ko'proq ma'lumotni to'ldiring

Maxfiylik bayonnomasi: Sizning shaxsiy hayotingiz biz uchun juda muhim. Bizning kompaniyamiz sizning shaxsiy ma'lumotlaringizni aniq ruxsatlaringiz bilan ekspluatatsiya qilishni taklif qilmaslikni va'da qiladi.

Yuborish