Bosh sahifa> Blog> Precautions for two or more cranes on the site

Precautions for two or more cranes on the site

September 10, 2021

When two or more tower cranes are working at close range (inferior to the respective jib lengths sum) in the same building yard can interfere each other. The following precautions must be taken:

(1) Jibs must be offset to avoid collision of any structural parts considering the maximum oscillation amplitude and a reasonable safety distance.

(2) The minimum distance between the two cranes must anyhow be great enough to prevent the cables and loads of the higher tower crane from interfering with the lower tower crane.

(3) In case of interfering cranes electrical or radar anti-collision system devices can be installed to limit the crane working range. Always consult the manufacturer for the installation of this safety device, once ascertained it really serves the purpose.

 RC-A11-ll

Remember that cranes must be always staggered in height to avoid any interference when under no-working conditions.

GHP6520-12 in Indonesia (5)

Biz bilan bog'lanish

Author:

Mr. Rick Zhao

E-mail:

bq@bq-sy.com

Phone/WhatsApp:

+86 13940298638

Ommabop mahsulotlar
Blog News
You may also like
Related Categories

Ushbu etkazib beruvchiga elektron pochta

Mavzu:
E-pochta:
Xabar:

Xabaringiz 20-8000 belgigacha bo'lishi kerak

Biz darhol siz bilan bog'lanamiz

Siz bilan tezroq bog'lanishingiz uchun ko'proq ma'lumotni to'ldiring

Maxfiylik bayonnomasi: Sizning shaxsiy hayotingiz biz uchun juda muhim. Bizning kompaniyamiz sizning shaxsiy ma'lumotlaringizni aniq ruxsatlaringiz bilan ekspluatatsiya qilishni taklif qilmaslikni va'da qiladi.

Yuborish